Goal
A migration can request a rebuild of dependent objects separately for its up script and its down script, and mitch performs it on every path that applies or reverts migrations. A second question rides along: whether a fresh deployment takes the shortest path or the same path an existing deployment takes.
Why
The direction matters, not the migration
Whether a rebuild is needed depends on the script that runs. Example on PostgreSQL: the up script extends a view with CREATE OR REPLACE VIEW, adding a column at the end, which works while other objects depend on the view. The down script has to remove that column again, which CREATE OR REPLACE VIEW cannot do; it needs DROP VIEW, which fails while a materialized view, a policy or another view depends on it. Here the revert needs the rebuild, the apply does not.
Reworks produce exactly this pattern. mitch rework prefills the new version's down script with the previous up script. If the new version only adds a column, the down script recreates the view without it and fails on PostgreSQL as soon as something depends on the view. Every path that reverts is affected: drop, down, redeploys of modified migrations, checkout back across a rework, and stash of a rework in progress.
Not every path rebuilds today
rebuild_dependants_of only acts when a migration is applied by up, add or checkout --and-up. Re-applying in checkout without --and-up, in stash, and in up --watch does not rebuild, and no revert rebuilds.
Shortest path or upgrade path
For the rework example from ADR runner/rebuild-reapplies-dependants-after-the-new-version, an existing deployment records
orders, order-summary, summary-report,
summary-report (revert), order-summary@2, summary-report
and a fresh deployment currently records the same, so that both share one history. On a fresh deployment it is fair to ask why summary-report is applied only to be reverted right away. The shortest path would be:
orders, order-summary, order-summary@2, summary-report
The end state of the rebuilt objects is the same, because their up scripts run last against the same new version in both paths; differences stay at catalog level, such as OIDs. The proposal from the design discussion: the shortest path by default, and a flag (working title --upgrade-path) for the path an existing deployment takes, so that CI can test what production will run.
Points raised so far:
- A rebuild is not necessarily cheap on a fresh deployment: a materialized view can read from external sources, for example through a foreign data wrapper.
- Replaying a recorded order (see Freeze) always takes the recorded path.
- On a fresh deployment, the shortest path conflicts with the ordering constraints a rework writes; see Ordering constraints in the shortest path.
- The audit table could record why an entry happened, for example "rebuild for
order-summary@2", so thatlogexplains the revert-and-re-apply steps instead of showing them unexplained.
Ordering constraints in the shortest path
The intent for a rebuild in the shortest path, in two lines:
- A dependant that is already applied is rebuilt.
- A dependant that is part of the run is sorted after the new version.
Terms
Part of the run means the migrations the current command will apply: for mitch up, the project's own migrations plus the linked ones they require; for mitch add A B C, the named migrations plus everything they depend on transitively. In both cases only those not yet applied. Migrations already applied are applied, not part of the run.
For an ordering constraint after = ["X"] on B:
| Situation | Constraint active? | Effect |
|---|---|---|
| X is applied | yes | met; X is already before B |
| X is part of the run | yes | mitch sorts B after X |
| X is neither | no | X is not rolled out, B runs anyway |
With mitch add: add B leaves X out and the constraint inactive; add B X applies X, then B; add A B, where A depends on X, brings X into the run as a dependency, so B again runs after X. Only the second row matters for sorting. The first matters when the order is reversed, that is when B is applied and X arrives later (late arrival, with a warning or --restore-order).
An active constraint is enforced in a run when mitch has to sort the migration behind X. When it is not enforced, mitch sorts as if the line were not there.
Why the rework's constraints get in the way
A rework writes the dependants of the previous version into after. If those constraints are enforced, a fresh deployment applies the dependants before the new version, and the rebuild then has to revert and re-apply them: that is the upgrade path, not the shortest one. The shortest path needs the opposite order. Enforcing the constraints is therefore the cause of the long path, not a way around it.
Proposed rule, which needs no new syntax: in the shortest path, mitch does not enforce those after constraints of a migration whose target depends on one of the migrations in the same migration's rebuild_dependants_of. All other ordering constraints stay enforced. With the upgrade-path flag, all are enforced, as today.
Example
Five migrations:
orderscreates a table.order-summarycreates the vieworder_summaryand depends onorders.summary-reportcreates the viewsummary_reportand depends onorder-summary, so it is a dependant.add-status-shippedadds an enum value and depends only onorders, not onorder-summary.order-summary@2comes frommitch rework, with the rebuild enabled andadd-status-shippedadded toafterby hand:
id = "order-summary@2"
dependencies = ["order-summary"]
after = ["summary-report", "add-status-shipped"]
rebuild_dependants_of = ["order-summary"]
The rule sorts the ordering constraints by asking, for each target, whether it depends on order-summary:
Target of after |
Depends on order-summary? |
In the shortest path |
|---|---|---|
summary-report |
yes | not enforced: rebuilt if applied, otherwise sorted after order-summary@2 |
add-status-shipped |
no | enforced |
Three runs of mitch up:
- Existing deployment, everything but
order-summary@2applied:summary-report (revert), order-summary@2, summary-reportsummary-reportwas there, so the rebuild handles it.add-status-shippedwas there, so its constraint is already met. - Fresh deployment, shortest path:
orders, order-summary, add-status-shipped, order-summary@2, summary-reportadd-status-shippedcomes beforeorder-summary@2because its constraint is enforced.summary-reportcomes after, because its constraint is not; it is created against the new view right away, without a revert. - Fresh deployment with the upgrade-path flag:
Both constraints are enforced, as today. This is the path of the existing deployment, which is what CI should test.orders, order-summary, summary-report, add-status-shipped, summary-report (revert), order-summary@2, summary-report
Open case: someone writes summary-report into after by hand because order-summary@2 really must run after it, and enables the rebuild. Mitch cannot tell that constraint from the one rework wrote; while the rebuild is enabled, the rule would not enforce it in the shortest path.
Effect on sorting
The algorithm stays a topological sort with creation time as the tie-break within each step; only the set of edges changes before sorting. That is already the case today, where active ordering constraints between migrations of the run are added to the dependencies. For a migration M with rebuild_dependants_of, the shortest path changes the edge set twice:
- M's ordering constraints on dependants of the rebuilt migrations are left out.
- For each of those dependants that is part of the run, the reverse edge is added: the dependant runs after M.
Step 2 is needed. With the constraint merely left out, summary-report and order-summary@2 become ready at the same time once order-summary is done, and the tie-break decides; summary-report is older and would come first, which is the long path again, by accident instead of on purpose.
To keep in mind:
- Cycles at run time. The reversed edge can form a cycle that the check at load time does not see, for example when M has a real dependency on a dependant it also asks to rebuild. That configuration contradicts itself. The sorter notices the cycle at once, but mitch has to report it as an error message, not a traceback.
- The edge set depends on the mode. The shortest path and the upgrade path sort the same graph with differently directed edges. One test per mode with the example above would cover it.
- Cost. Mitch needs the dependants of the rebuilt migrations, a closure it already computes for the rebuild itself.
Already settled
- Rebuilds go through mitch's migration graph instead of catalog walks: ADR
runner/rebuild-dependants-through-the-migration-graph. - Today a rebuild re-applies dependants after the new version, and fresh and existing deployments share one history: ADR
runner/rebuild-reapplies-dependants-after-the-new-version. This topic reopens that decision. - A reworked version depends on its previous version, which every deployment runs first: ADR
cli/rework/rework-keeps-the-previous-version-in-every-history. - Up and down scripts are also told apart in Destructive scripts; both topics may share a configuration shape.